new

Get trending papers in your email inbox!

Subscribe

Daily Papers

byAK and the research community

Aug 4

Graph-RHO: Critical-path-aware Heterogeneous Graph Network for Long-Horizon Flexible Job-Shop Scheduling

Long-horizon Flexible Job-Shop Scheduling~(FJSP) presents a formidable combinatorial challenge due to complex, interdependent decisions spanning extended time horizons. While learning-based Rolling Horizon Optimization~(RHO) has emerged as a promising paradigm to accelerate solving by identifying and fixing invariant operations, its effectiveness is hindered by the structural complexity of FJSP. Existing methods often fail to capture intricate graph-structured dependencies and ignore the asymmetric costs of prediction errors, in which misclassifying critical-path operations is significantly more detrimental than misclassifying non-critical ones. Furthermore, dynamic shifts in predictive confidence during the rolling process make static pruning thresholds inadequate. To address these limitations, we propose Graph-RHO, a novel critical-path-aware graph-based RHO framework. First, we introduce a topology-aware heterogeneous graph network that encodes subproblems as operation-machine graphs with multi-relational edges, leveraging edge-feature-aware message passing to predict operation stability. Second, we incorporate a critical-path-aware mechanism that injects inductive biases during training to distinguish highly sensitive bottleneck operations from robust ones. Third, we devise an adaptive thresholding strategy that dynamically calibrates decision boundaries based on online uncertainty estimation to align model predictions with the solver's search space. Extensive experiments on standard benchmarks demonstrate that Graph-RHO establishes a new state of the art in solution quality and computational efficiency. Remarkably, it exhibits exceptional zero-shot generalization, reducing solve time by over 30\% on large-scale instances (2000 operations) while achieving superior solution quality. Our code is available https://github.com/IntelliSensing/Graph-RHO{here}.

  • 5 authors
·
Apr 10

Representation over Routing: Diagnosing Temporal Routing Pathologies in Multi-Timescale PPO

Temporal credit assignment in reinforcement learning is often approached by introducing value estimates at multiple discount factors. A natural next step is to let the actor dynamically route among these temporal heads, using either differentiable attention or heuristic uncertainty weights. This paper argues that such routing can create a numerical shortcut rather than a reliable temporal abstraction. We study this issue in a controlled PPO setting on LunarLander-v2, using the environment as a visual sandbox for diagnosing failure modes. First, we formalize Surrogate Objective Hacking: a differentiable softmax router exposed to the PPO surrogate receives a direct gradient toward advantage heads that are numerically favorable for the current update, even when this routing change does not correspond to improved physical control. Because unnormalized advantages at different discount factors have different effective scales, this creates a scale-discrepancy vulnerability. Second, we identify the Paradox of Temporal Uncertainty in gradient-free error-based routing: short-horizon heads can receive the largest routing share because their prediction targets are easier, even when they are less aligned with delayed task success. As a structural response, we study Target Decoupling: the critic may retain multi-timescale auxiliary heads, but the actor is updated only with the long-horizon advantage. Target Decoupling is not presented as a broad performance booster; in this run set it removes the exploitable actor-side routing pathway and improves the observed worst-seed return. Code is available at https://github.com/ben-dlwlrma/Representation-Over-Routing.

  • 1 authors
·
May 29 4

ERPO: Token-Level Entropy-Regulated Policy Optimization for Large Reasoning Models

Reinforcement learning from verifiable rewards has significantly advanced the reasoning capabilities of large language models. However, Group Relative Policy Optimization (GRPO) typically assigns a uniform, sequence-level advantage to all tokens, thereby overlooking the intrinsic information heterogeneity along reasoning chains. We show that this coarse-grained credit assignment leads to premature entropy collapse and encourages the model to generate redundant, low-quality reasoning paths. Through systematic empirical analysis, we identify Critical Decision Pivots (CDPs): transient high-entropy states where the policy's trajectory is most sensitive to perturbations. These pivots represent the "forks in the road" where effective multi-path exploration is most crucial yet often suppressed by uniform advantage signals. Building on these insights, we propose Entropy-Regulated Policy Optimization (ERPO), which transitions the optimization focus from coarse sequences to fine-grained token dynamics. ERPO introduces three synergistic components: (i) Entropy-aware Gating, which adaptively amplifies exploration at CDPs to facilitate diverse path discovery; (ii) Bucket-based Implicit Normalization, which mitigates difficulty bias by aligning token progress windows; and (iii) Result-anchored Advantage Synthesis, which re-weights token-level signals via outcome-driven anchors. Extensive experiments on competitive mathematical benchmarks demonstrate that ERPO significantly outperforms GRPO. Notably, ERPO not only boosts reasoning accuracy but also yields significantly more concise and robust derivation paths, while achieving performance comparable to large models with orders of magnitude more parameters.

  • 4 authors
·
Apr 2

On the Collapse of Generative Paths: A Criterion and Correction for Diffusion Steering

Inference-time steering enables pretrained diffusion/flow models to be adapted to new tasks without retraining. A widely used approach is the ratio-of-densities method, which defines a time-indexed target path by reweighting probability-density trajectories from multiple models with positive, or in some cases, negative exponents. This construction, however, harbors a critical and previously unformalized failure mode: Marginal Path Collapse, where intermediate densities become non-normalizable even though endpoints remain valid. Collapse arises systematically when composing heterogeneous models trained on different noise schedules or datasets, including a common setting in molecular design where de-novo, conformer, and pocket-conditioned models must be combined for tasks such as flexible-pose scaffold decoration. We provide a novel and complete solution for the problem. First, we derive a simple path existence criterion that predicts exactly when collapse occurs from noise schedules and exponents alone. Second, we introduce Adaptive path Correction with Exponents (ACE), which extends Feynman-Kac steering to time-varying exponents and guarantees a valid probability path. On a synthetic 2D benchmark and on flexible-pose scaffold decoration, ACE eliminates collapse and enables high-guidance compositional generation, improving distributional and docking metrics over constant-exponent baselines and even specialized task-specific scaffold decoration models. Our work turns ratio-of-densities steering with heterogeneous experts from an unstable heuristic into a reliable tool for controllable generation.

  • 9 authors
·
Dec 10, 2025

FMT^{x}: An Efficient and Asymptotically Optimal Extension of the Fast Marching Tree for Dynamic Replanning

Path planning in dynamic environments remains a core challenge in robotics, especially as autonomous systems are deployed in unpredictable spaces such as warehouses and public roads. While algorithms like Fast Marching Tree (FMT^{*}) offer asymptotically optimal solutions in static settings, their single-pass design prevents path revisions which are essential for real-time adaptation. On the other hand, full replanning is often too computationally expensive. This paper introduces FMT^{x}, an extension of the Fast Marching Tree algorithm that enables efficient and consistent replanning in dynamic environments. We revisit the neighbor selection rule of FMT^{*} and demonstrate that a minimal change overcomes its single-pass limitation, enabling the algorithm to update cost-to-come values upon discovering better connections without sacrificing asymptotic optimality or computational efficiency. By maintaining a cost-ordered priority queue and applying a selective update condition that uses an expanding neighbor to identify and trigger the re-evaluation of any node with a potentially suboptimal path, FMT^{x} ensures that suboptimal routes are efficiently repaired as the environment evolves. This targeted strategy preserves the inherent efficiency of FMT^{*} while enabling robust adaptation to changes in obstacle configuration. FMT^{x} is proven to recover an asymptotically optimal solution after environmental changes. Experimental results demonstrate that FMT^{x} outperforms the influential replanner RRT^{x}, reacting more swiftly to dynamic events with lower computational overhead and thus offering a more effective solution for real-time robotic navigation in unpredictable worlds.

  • 1 authors
·
Sep 10, 2025

ProRL: Effective Reinforcement Learning for Proactive Recommendation via Rectified Policy Gradient Estimation

Proactive Recommender Systems (PRSs) aim to guide user preference shift toward target items by generating paths of intermediate recommendations. Reinforcement learning (RL) provides a principled framework for optimizing such sequential decision tasks, as path rewards can naturally capture both short-term acceptance and long-term guidance effectiveness. However, naively applying policy gradients to PRS results in deficient gradient estimation. We identify two deficiencies: (1) path-level rewards decompose into step-level rewards with positive mean, creating a length-dependent bias that causes gradients to favor path extension over meaningful exploration; (2) weighting each step by the entire path-level reward ignores the decomposition structure, leading to high gradient variance. To rectify these two deficiencies, we propose an effective RL framework ProRL with two novel mechanisms for proactive recommendation. First, Stepwise Reward Centering subtracts expected rewards to neutralize length-dependent bias, ensuring that path extension yields zero expected gradient signal. Second, Position-Specific Advantage Estimation leverages the reward decomposition structure to compute step-dependent baselines, reducing gradient variance. Together, these mechanisms yield policy gradients that precisely target path quality. Our experiments on three real-world datasets demonstrate that ProRL significantly outperforms state-of-the-art PRSs. Our code is available at https://github.com/hongruhou89/ProRL.

TourPlanner: A Competitive Consensus Framework with Constraint-Gated Reinforcement Learning for Travel Planning

Travel planning is a sophisticated decision-making process that requires synthesizing multifaceted information to construct itineraries. However, existing travel planning approaches face several challenges: (1) Pruning candidate points of interest (POIs) while maintaining a high recall rate; (2) A single reasoning path restricts the exploration capability within the feasible solution space for travel planning; (3) Simultaneously optimizing hard constraints and soft constraints remains a significant difficulty. To address these challenges, we propose TourPlanner, a comprehensive framework featuring multi-path reasoning and constraint-gated reinforcement learning. Specifically, we first introduce a Personalized Recall and Spatial Optimization (PReSO) workflow to construct spatially-aware candidate POIs' set. Subsequently, we propose Competitive consensus Chain-of-Thought (CCoT), a multi-path reasoning paradigm that improves the ability of exploring the feasible solution space. To further refine the plan, we integrate a sigmoid-based gating mechanism into the reinforcement learning stage, which dynamically prioritizes soft-constraint satisfaction only after hard constraints are met. Experimental results on travel planning benchmarks demonstrate that TourPlanner achieves state-of-the-art performance, significantly surpassing existing methods in both feasibility and user-preference alignment.

  • 8 authors
·
Jan 8 3

Learn to Follow: Decentralized Lifelong Multi-agent Pathfinding via Planning and Learning

Multi-agent Pathfinding (MAPF) problem generally asks to find a set of conflict-free paths for a set of agents confined to a graph and is typically solved in a centralized fashion. Conversely, in this work, we investigate the decentralized MAPF setting, when the central controller that posses all the information on the agents' locations and goals is absent and the agents have to sequientially decide the actions on their own without having access to a full state of the environment. We focus on the practically important lifelong variant of MAPF, which involves continuously assigning new goals to the agents upon arrival to the previous ones. To address this complex problem, we propose a method that integrates two complementary approaches: planning with heuristic search and reinforcement learning through policy optimization. Planning is utilized to construct and re-plan individual paths. We enhance our planning algorithm with a dedicated technique tailored to avoid congestion and increase the throughput of the system. We employ reinforcement learning to discover the collision avoidance policies that effectively guide the agents along the paths. The policy is implemented as a neural network and is effectively trained without any reward-shaping or external guidance. We evaluate our method on a wide range of setups comparing it to the state-of-the-art solvers. The results show that our method consistently outperforms the learnable competitors, showing higher throughput and better ability to generalize to the maps that were unseen at the training stage. Moreover our solver outperforms a rule-based one in terms of throughput and is an order of magnitude faster than a state-of-the-art search-based solver.

  • 5 authors
·
Oct 2, 2023

MCPHunt: An Evaluation Framework for Cross-Boundary Data Propagation in Multi-Server MCP Agents

Multi-server MCP agents create an information-flow control problem: faithful tool composition can turn individually benign read/write permissions into cross-boundary credential propagation -- a structural side effect of workflow topology, not necessarily malicious model behavior. We present MCPHunt, to our knowledge the first controlled benchmark that isolates non-adversarial, verbatim credential propagation across multi-server MCP trust boundaries, with three methodological contributions: (1) canary-based taint tracking that reduces propagation detection to objective string matching; (2) an environment-controlled coverage design with risky, benign, and hard-negative conditions that validates pipeline soundness and controls for credential-format confounds; (3) CRS stratification that disentangles task-mandated propagation (faithful execution of verbatim-transfer instructions) from policy-violating propagation (credentials included despite the option to redact). Across 3,615 main-benchmark traces from 5 models spanning 147 tasks and 9 mechanism families, policy-violating propagation rates reach 11.5--41.3% across all models. This propagation is pathway-specific (25x cross-mechanism range) and concentrated in browser-mediated data flows; hard-negative controls provide evidence that production-format credentials are not necessary -- prompt-directed cross-boundary data flow is sufficient. A prompt-mitigation study across 3 models reduces policy-violating propagation by up to 97% while preserving 80.5% utility, but effectiveness varies with instruction-following capability -- suggesting that prompt-level defenses alone may not suffice. Code, traces, and labeling pipeline are released under MIT and CC BY 4.0.

  • 4 authors
·
Apr 29

Critical-CoT: A Robust Defense Framework against Reasoning-Level Backdoor Attacks in Large Language Models

Large Language Models (LLMs), despite their impressive capabilities across domains, have been shown to be vulnerable to backdoor attacks. Prior backdoor strategies predominantly operate at the token level, where an injected trigger causes the model to generate a specific target word, choice, or class (depending on the task). Recent advances, however, exploit the long-form reasoning tendencies of modern LLMs to conduct reasoning-level backdoors: once triggered, the victim model inserts one or more malicious reasoning steps into its chain-of-thought (CoT). These attacks are substantially harder to detect, as the backdoored answer remains plausible and consistent with the poisoned reasoning trajectory. Yet, defenses tailored to this type of backdoor remain largely unexplored. To bridge this gap, we propose Critical-CoT, a novel defense mechanism that conducts a two-stage fine-tuning (FT) process on LLMs to develop critical thinking behaviors, enabling them to automatically identify potential backdoors and refuse to generate malicious reasoning steps. Extensive experiments across multiple LLMs and datasets demonstrate that Critical-CoT provides strong robustness against both in-context learning-based and FT-based backdoor attacks. Notably, Critical-CoT exhibits strong cross-domain and cross-task generalization. Our code is available at hthttps://github.com/tuanvu171/Critical-CoT.

  • 2 authors
·
Apr 11

Budget-Aware Agentic Routing via Boundary-Guided Training

As large language models (LLMs) evolve into autonomous agents that execute long-horizon workflows, invoking a high-capability model at every step becomes economically unsustainable. While model routing is effective for single-turn queries, agentic routing is a sequential, path-dependent problem: early mistakes compound, feedback is often at the end of the episode, and deployments often demand strict per-task spending limits. We propose Budget-Aware Agentic Routing, which selects between a cheap and an expensive model at each step to optimize the cost--success frontier and to operate under strict per-task budgets. We propose Boundary-Guided Training, which leverages two boundary policies (always-small vs.\ always-large) to build a difficulty taxonomy and to anchor learning under sparse rewards. Our approach warms start with boundary-guided SFT data synthesis via stratified sampling of cost-efficient trajectories, then applies Boundary-Guided Policy Optimization (BoPO), combining boundary-relative rewards with a reference-guided advantage to avoid degenerate cheap-failure solutions. Experiment results show that our method improves the efficiency frontier, matching strong routing baselines at substantially lower cost while demonstrating generalization to strict inference-time budget constraints. Overall, our work establishes a foundational framework for agentic routing, shifting the paradigm from static model selection to dynamic, budget-aware sequential decision-making.

  • 8 authors
·
Feb 3

Verified Critical Step Optimization for LLM Agents

As large language model agents tackle increasingly complex long-horizon tasks, effective post-training becomes critical. Prior work faces fundamental challenges: outcome-only rewards fail to precisely attribute credit to intermediate steps, estimated step-level rewards introduce systematic noise, and Monte Carlo sampling approaches for step reward estimation incur prohibitive computational cost. Inspired by findings that only a small fraction of high-entropy tokens drive effective RL for reasoning, we propose Critical Step Optimization (CSO), which focuses preference learning on verified critical steps, decision points where alternate actions demonstrably flip task outcomes from failure to success. Crucially, our method starts from failed policy trajectories rather than expert demonstrations, directly targeting the policy model's weaknesses. We use a process reward model (PRM) to identify candidate critical steps, leverage expert models to propose high-quality alternatives, then continue execution from these alternatives using the policy model itself until task completion. Only alternatives that the policy successfully executes to correct outcomes are verified and used as DPO training data, ensuring both quality and policy reachability. This yields fine-grained, verifiable supervision at critical decisions while avoiding trajectory-level coarseness and step-level noise. Experiments on GAIA-Text-103 and XBench-DeepSearch show that CSO achieves 37% and 26% relative improvement over the SFT baseline and substantially outperforms other post-training methods, while requiring supervision at only 16% of trajectory steps. This demonstrates the effectiveness of selective verification-based learning for agent post-training.

  • 8 authors
·
Feb 3

A^2FM: An Adaptive Agent Foundation Model for Tool-Aware Hybrid Reasoning

Large language models split into two families: reasoning-centric LLMs, which strengthen internal chain-of-thought reasoning but cannot invoke external tools, and agentic LLMs, which learn to interact with environments and leverage tools but often lag in deep reasoning. This divide arises from fundamentally different training objectives, leading to mismatched strengths and inefficiency on simple queries, where both families tend to overthink or over-call tools. In this work, we present Adaptive Agent Foundation Model (A^2FM), a unified framework that follows a route-then-align principle: the model first learns task-aware routing and then aligns mode-specific trajectories under a shared backbone. To address the inefficiency gap, we introduce a third mode-instant-that handles simple queries directly, preventing unnecessary reasoning or tool calls while complementing the agentic and reasoning modes. To jointly enhance accuracy and efficiency, we propose Adaptive Policy Optimization (APO), which enforces adaptive sampling across modes and applies a cost-regularized reward. On the 32B scale, A^2FM achieves 13.4% on BrowseComp, 70.4% on AIME25, and 16.7% on HLE, setting new SOTA among comparable models and performing competitively with frontier LLMs across agentic, reasoning, and general benchmarks. Notably, the adaptive execution achieves a cost of pass of only $0.00487 per correct answer-cutting cost by 45.2% relative to reasoning and 33.5% relative to agentic, thus delivering substantially higher cost efficiency while maintaining comparable accuracy.

OPPOer OPPO
·
Oct 13, 2025 3

Efficient and Interpretable Multi-Agent LLM Routing via Ant Colony Optimization

Large Language Model (LLM)-driven Multi-Agent Systems (MAS) have demonstrated strong capability in complex reasoning and tool use, and heterogeneous agent pools further broaden the quality--cost trade-off space. Despite these advances, real-world deployment is often constrained by high inference cost, latency, and limited transparency, which hinders scalable and efficient routing. Existing routing strategies typically rely on expensive LLM-based selectors or static policies, and offer limited controllability for semantic-aware routing under dynamic loads and mixed intents, often resulting in unstable performance and inefficient resource utilization. To address these limitations, we propose AMRO-S, an efficient and interpretable routing framework for Multi-Agent Systems (MAS). AMRO-S models MAS routing as a semantic-conditioned path selection problem, enhancing routing performance through three key mechanisms: First, it leverages a supervised fine-tuned (SFT) small language model for intent inference, providing a low-overhead semantic interface for each query; second, it decomposes routing memory into task-specific pheromone specialists, reducing cross-task interference and optimizing path selection under mixed workloads; finally, it employs a quality-gated asynchronous update mechanism to decouple inference from learning, optimizing routing without increasing latency. Extensive experiments on five public benchmarks and high-concurrency stress tests demonstrate that AMRO-S consistently improves the quality--cost trade-off over strong routing baselines, while providing traceable routing evidence through structured pheromone patterns.

  • 11 authors
·
Mar 13

The Workload-Router-Pool Architecture for LLM Inference Optimization: A Vision Paper from the vLLM Semantic Router Project

Over the past year, the vLLM Semantic Router project has released a series of work spanning: (1) core routing mechanisms -- signal-driven routing, context-length pool routing, router performance engineering, policy conflict detection, low-latency embedding models, category-aware semantic caching, user-feedback-driven routing adaptation, hallucination detection, and hierarchical content-safety classification for privacy and jailbreak protection; (2) fleet optimization -- fleet provisioning and energy-efficiency analysis; (3) agentic and multimodal routing -- multimodal agent routing, tool selection, CUA security, and multi-turn context memory and safety; (4) governance and standards -- inference routing protocols and multi-provider API extensions. Each paper tackled a specific problem in LLM inference, but the problems are not independent; for example, fleet provisioning depends on the routing policy, which depends on the workload mix, shifting as organizations adopt agentic and multimodal workloads. This paper distills those results into the Workload-Router-Pool (WRP) architecture, a three-dimensional framework for LLM inference optimization. Workload characterizes what the fleet serves (chat vs. agent, single-turn vs. multi-turn, warm vs. cold, prefill-heavy vs. decode-heavy). Router determines how each request is dispatched (static semantic rules, online bandit adaptation, RL-based model selection, quality-aware cascading). Pool defines where inference runs (homogeneous vs. heterogeneous GPU, disaggregated prefill/decode, KV-cache topology). We map our prior work onto a 3x3 WRP interaction matrix, identify which cells we have covered and which remain open, and propose twenty-one concrete research directions at the intersections, each grounded in our prior measurements, tiered by maturity from engineering-ready to open research.

  • 8 authors
·
Apr 7

Improved Training Technique for Shortcut Models

Shortcut models represent a promising, non-adversarial paradigm for generative modeling, uniquely supporting one-step, few-step, and multi-step sampling from a single trained network. However, their widespread adoption has been stymied by critical performance bottlenecks. This paper tackles the five core issues that held shortcut models back: (1) the hidden flaw of compounding guidance, which we are the first to formalize, causing severe image artifacts; (2) inflexible fixed guidance that restricts inference-time control; (3) a pervasive frequency bias driven by a reliance on low-level distances in the direct domain, which biases reconstructions toward low frequencies; (4) divergent self-consistency arising from a conflict with EMA training; and (5) curvy flow trajectories that impede convergence. To address these challenges, we introduce iSM, a unified training framework that systematically resolves each limitation. Our framework is built on four key improvements: Intrinsic Guidance provides explicit, dynamic control over guidance strength, resolving both compounding guidance and inflexibility. A Multi-Level Wavelet Loss mitigates frequency bias to restore high-frequency details. Scaling Optimal Transport (sOT) reduces training variance and learns straighter, more stable generative paths. Finally, a Twin EMA strategy reconciles training stability with self-consistency. Extensive experiments on ImageNet 256 x 256 demonstrate that our approach yields substantial FID improvements over baseline shortcut models across one-step, few-step, and multi-step generation, making shortcut models a viable and competitive class of generative models.

  • 7 authors
·
Oct 24, 2025

Focusing on What Matters: Saliency-Harnessing Accurate Routing for Diffusion MoE

Mixture-of-Experts (MoE) architectures have emerged as a powerful paradigm for scaling diffusion models in visual generation. Recent advancements have focused on adaptively allocating computational resources across diverse tokens to improve efficiency and performance. However, we identify a routing assignment problem in existing diffusion MoE frameworks: the router fails to accurately allocate more computational resources to salient tokens. Our analysis attributes this failure to the router's reliance on noise-corrupted latent features throughout the denoising process. Such stochastic noise obscures the critical structural and textural information, thereby preventing the router from effectively distinguishing salient tokens. To address this, we propose SharpMoE, a post-training framework with a saliency-harnessing accurate routing mechanism, which utilizes clean latent features as a noise-free guidance signal for routing. By bypassing the noise-distorted inputs, SharpMoE provides the router with clear saliency guidance, enabling the identification of salient tokens even in high-noise stages. Furthermore, we introduce a trajectory routing loss to constrain the compute allocation throughout the multi-step denoising trajectory, ensuring precise resource allocation along the generation rollout. Extensive experiments demonstrate that SharpMoE serves as a versatile, plug-and-play solution that further enhances the pretrained, converged MoE models, achieving state-of-the-art performance in visual generation.

AlibabaTongyiLab TongyiLab
·
Jun 24 2

Graph-Based Self-Healing Tool Routing for Cost-Efficient LLM Agents

Tool-using LLM agents face a reliability-cost tradeoff: routing every decision through the LLM improves correctness but incurs high latency and inference cost, while pre-coded workflow graphs reduce cost but become brittle under unanticipated compound tool failures. We present Self-Healing Router, a fault-tolerant orchestration architecture that treats most agent control-flow decisions as routing rather than reasoning. The system combines (i) parallel health monitors that assign priority scores to runtime conditions such as tool outages and risk signals, and (ii) a cost-weighted tool graph where Dijkstra's algorithm performs deterministic shortest-path routing. When a tool fails mid-execution, its edges are reweighted to infinity and the path is recomputed -- yielding automatic recovery without invoking the LLM. The LLM is reserved exclusively for cases where no feasible path exists, enabling goal demotion or escalation. Prior graph-based tool-use systems (ControlLLM, ToolNet, NaviAgent) focus on tool selection and planning; our contribution is runtime fault tolerance with deterministic recovery and binary observability -- every failure is either a logged reroute or an explicit escalation, never a silent skip. Across 19 scenarios spanning three graph topologies (linear pipeline, dependency DAG, parallel fan-out), Self-Healing Router matches ReAct's correctness while reducing control-plane LLM calls by 93% (9 vs 123 aggregate) and eliminating the silent-failure cases observed in a well-engineered static workflow baseline under compound failures.

  • 1 authors
·
Mar 2

Informed RRT*: Optimal Sampling-based Path Planning Focused via Direct Sampling of an Admissible Ellipsoidal Heuristic

Rapidly-exploring random trees (RRTs) are popular in motion planning because they find solutions efficiently to single-query problems. Optimal RRTs (RRT*s) extend RRTs to the problem of finding the optimal solution, but in doing so asymptotically find the optimal path from the initial state to every state in the planning domain. This behaviour is not only inefficient but also inconsistent with their single-query nature. For problems seeking to minimize path length, the subset of states that can improve a solution can be described by a prolate hyperspheroid. We show that unless this subset is sampled directly, the probability of improving a solution becomes arbitrarily small in large worlds or high state dimensions. In this paper, we present an exact method to focus the search by directly sampling this subset. The advantages of the presented sampling technique are demonstrated with a new algorithm, Informed RRT*. This method retains the same probabilistic guarantees on completeness and optimality as RRT* while improving the convergence rate and final solution quality. We present the algorithm as a simple modification to RRT* that could be further extended by more advanced path-planning algorithms. We show experimentally that it outperforms RRT* in rate of convergence, final solution cost, and ability to find difficult passages while demonstrating less dependence on the state dimension and range of the planning problem.

  • 3 authors
·
Nov 27, 2014

ExpertFlow: Optimized Expert Activation and Token Allocation for Efficient Mixture-of-Experts Inference

Sparse Mixture of Experts (MoE) models, while outperforming dense Large Language Models (LLMs) in terms of performance, face significant deployment challenges during inference due to their high memory demands. Existing offloading techniques, which involve swapping activated and idle experts between the GPU and CPU, often suffer from rigid expert caching mechanisms. These mechanisms fail to adapt to dynamic routing, leading to inefficient cache utilization, or incur prohibitive costs for prediction training. To tackle these inference-specific challenges, we introduce ExpertFlow, a comprehensive system specifically designed to enhance inference efficiency by accommodating flexible routing and enabling efficient expert scheduling between CPU and GPU. This reduces overhead and boosts system performance. Central to our approach is a predictive routing path-based offloading mechanism that utilizes a lightweight predictor to accurately forecast routing paths before computation begins. This proactive strategy allows for real-time error correction in expert caching, significantly increasing cache hit ratios and reducing the frequency of expert transfers, thereby minimizing I/O overhead. Additionally, we implement a dynamic token scheduling strategy that optimizes MoE inference by rearranging input tokens across different batches. This method not only reduces the number of activated experts per batch but also improves computational efficiency. Our extensive experiments demonstrate that ExpertFlow achieves up to 93.72\% GPU memory savings and enhances inference speed by 2 to 10 times compared to baseline methods, highlighting its effectiveness and utility as a robust solution for resource-constrained inference scenarios.

  • 10 authors
·
Oct 23, 2024

Equifinality in Mixture of Experts: Routing Topology Does Not Determine Language Modeling Quality

Sparse Mixture-of-Experts (MoE) architectures employ increasingly sophisticated routing mechanisms -- learned routers, multi-hop trajectories, token-dependent gating. We ask: does routing topology actually determine language modeling quality? We build a geometric MoE (ST-MoE) using cosine-similarity routing against learned centroids in a low-dimensional space (d_{space} = 64), requiring 80% fewer routing parameters than standard linear routers. Through 62 controlled experiments on WikiText-103 at 76--84M parameters trained to convergence (50K steps, 1.64B tokens), we find that routing topology does not determine asymptotic perplexity (PPL): five cosine-routing variants are statistically equivalent within a 1-PPL margin (Two One-Sided Tests [TOST], p < 0.05 for all 10 pairwise comparisons; 15 runs across 3 seeds, observed range 33.93--34.72). The finding extends to hash, random-fixed, and top-1 routing (single-seed; graceful 1.1--2.2 PPL degradation) and replicates on OpenWebText (0.03 PPL gap, 6 runs, 3 seeds each). A standard linear router with 5.3times more routing parameters reaches PPL 32.76, but iso-parameter cosine routing closes 67% of this gap -- the true mechanism advantage is sim1.2%. The mechanistic explanation is convergent redundancy: multi-hop updates are collinear (cos(Δh_0, Δh_1) = 0.805), implementing magnitude amplification rather than compositional reasoning; a single learnable scalar replicates multi-hop performance. As a practical payoff, zero-shot relative-norm halting saves 25% of MoE FLOPs at +0.12% PPL. Expert-level specialization and causal controllability -- which coexist with topology-level equifinality -- are explored in a companion paper.

  • 2 authors
·
Apr 14

All Routes Lead to Collapse

Attention sinks, representation collapse, and norm stratification are treated as transformer-specific pathologies. We show they are not specific to attention: they are what content-based routing does under a fixed similarity metric. We give a reframing identity: softmax attention is Boltzmann-weighted aggregation over Euclidean distances with constant key norms, so its score omits a -|k|^2 term and is blind to key magnitude. This predicts that any router whose metric is ill-matched to its representations should compensate, by concentrating its routing and collapsing the routed representations. We test it on routers that score and aggregate over different axes: softmax attention over tokens (nine pretrained transformers), graph attention over nodes, a selective state-space model and a recurrent mixer over time, and learned residuals over depth. All develop the same signature, and two within-model ablations show it is caused by the routing mechanism rather than by incidental dynamics. The form is contingent, set by the strength of the positional brake each router carries alongside its content score; we sweep that brake and move the onset across its whole range. The mechanism is not contingent, and it does not require norm stratification: a router with norm-normalized keys concentrates just the same. We do not claim these models implement Riemannian geometry; the geometric view is a diagnostic that names the inadequacy of the flat, norm-blind metric.

  • 1 authors
·
Jun 20

Sampling-based Algorithms for Optimal Motion Planning

During the last decade, sampling-based path planning algorithms, such as Probabilistic RoadMaps (PRM) and Rapidly-exploring Random Trees (RRT), have been shown to work well in practice and possess theoretical guarantees such as probabilistic completeness. However, little effort has been devoted to the formal analysis of the quality of the solution returned by such algorithms, e.g., as a function of the number of samples. The purpose of this paper is to fill this gap, by rigorously analyzing the asymptotic behavior of the cost of the solution returned by stochastic sampling-based algorithms as the number of samples increases. A number of negative results are provided, characterizing existing algorithms, e.g., showing that, under mild technical conditions, the cost of the solution returned by broadly used sampling-based algorithms converges almost surely to a non-optimal value. The main contribution of the paper is the introduction of new algorithms, namely, PRM* and RRT*, which are provably asymptotically optimal, i.e., such that the cost of the returned solution converges almost surely to the optimum. Moreover, it is shown that the computational complexity of the new algorithms is within a constant factor of that of their probabilistically complete (but not asymptotically optimal) counterparts. The analysis in this paper hinges on novel connections between stochastic sampling-based path planning algorithms and the theory of random geometric graphs.

  • 2 authors
·
May 4, 2011

Modality-Guided Mixture of Graph Experts with Entropy-Triggered Routing for Multimodal Recommendation

Multimodal recommendation enhances ranking by integrating user-item interactions with item content, which is particularly effective under sparse feedback and long-tail distributions. However, multimodal signals are inherently heterogeneous and can conflict in specific contexts, making effective fusion both crucial and challenging. Existing approaches often rely on shared fusion pathways, leading to entangled representations and modality imbalance. To address these issues, we propose MAGNET, a Modality-Guided Mixture of Adaptive Graph Experts Network with Progressive Entropy-Triggered Routing for Multimodal Recommendation, designed to enhance controllability, stability, and interpretability in multimodal fusion. MAGNET couples interaction-conditioned expert routing with structure-aware graph augmentation, so that both what to fuse and how to fuse are explicitly controlled and interpretable. At the representation level, a dual-view graph learning module augments the interaction graph with content-induced edges, improving coverage for sparse and long-tail items while preserving collaborative structure via parallel encoding and lightweight fusion. At the fusion level, MAGNET employs structured experts with explicit modality roles-dominant, balanced, and complementary-enabling a more interpretable and adaptive combination of behavioral, visual, and textual cues. To further stabilize sparse routing and prevent expert collapse, we introduce a two-stage entropy-weighting mechanism that monitors routing entropy. This mechanism automatically transitions training from an early coverage-oriented regime to a later specialization-oriented regime, progressively balancing expert utilization and routing confidence. Extensive experiments on public benchmarks demonstrate consistent improvements over strong baselines.

  • 3 authors
·
Feb 24

Deceptive Path Planning via Reinforcement Learning with Graph Neural Networks

Deceptive path planning (DPP) is the problem of designing a path that hides its true goal from an outside observer. Existing methods for DPP rely on unrealistic assumptions, such as global state observability and perfect model knowledge, and are typically problem-specific, meaning that even minor changes to a previously solved problem can force expensive computation of an entirely new solution. Given these drawbacks, such methods do not generalize to unseen problem instances, lack scalability to realistic problem sizes, and preclude both on-the-fly tunability of deception levels and real-time adaptivity to changing environments. In this paper, we propose a reinforcement learning (RL)-based scheme for training policies to perform DPP over arbitrary weighted graphs that overcomes these issues. The core of our approach is the introduction of a local perception model for the agent, a new state space representation distilling the key components of the DPP problem, the use of graph neural network-based policies to facilitate generalization and scaling, and the introduction of new deception bonuses that translate the deception objectives of classical methods to the RL setting. Through extensive experimentation we show that, without additional fine-tuning, at test time the resulting policies successfully generalize, scale, enjoy tunable levels of deception, and adapt in real-time to changes in the environment.

  • 3 authors
·
Feb 9, 2024

WebOperator: Action-Aware Tree Search for Autonomous Agents in Web Environment

LLM-based agents often operate in a greedy, step-by-step manner, selecting actions solely based on the current observation without considering long-term consequences or alternative paths. This lack of foresight is particularly problematic in web environments, which are only partially observable-limited to browser-visible content (e.g., DOM and UI elements)-where a single misstep often requires complex and brittle navigation to undo. Without an explicit backtracking mechanism, agents struggle to correct errors or systematically explore alternative paths. Tree-search methods provide a principled framework for such structured exploration, but existing approaches lack mechanisms for safe backtracking, making them prone to unintended side effects. They also assume that all actions are reversible, ignoring the presence of irreversible actions-limitations that reduce their effectiveness in realistic web tasks. To address these challenges, we introduce WebOperator, a tree-search framework that enables reliable backtracking and strategic exploration. Our method incorporates a best-first search strategy that ranks actions by both reward estimates and safety considerations, along with a robust backtracking mechanism that verifies the feasibility of previously visited paths before replaying them, preventing unintended side effects. To further guide exploration, WebOperator generates action candidates from multiple, varied reasoning contexts to ensure diverse and robust exploration, and subsequently curates a high-quality action set by filtering out invalid actions pre-execution and merging semantically equivalent ones. Experimental results on WebArena and WebVoyager demonstrate the effectiveness of WebOperator. On WebArena, WebOperator achieves a state-of-the-art 54.6% success rate with gpt-4o, underscoring the critical advantage of integrating strategic foresight with safe execution.

  • 4 authors
·
Dec 14, 2025 2

CASCADE: Cascaded Scoped Communication for Multi-Agent Re-planning in Disrupted Industrial Environments

Industrial disruption replanning demands multi-agent coordination under strict latency and communication budgets, where disruptions propagate through tightly coupled physical dependencies and rapidly invalidate baseline schedules and commitments. Existing coordination schemes often treat communication as either effectively free (broadcast-style escalation) or fixed in advance (hand-tuned neighborhoods), both of which are brittle once the disruption footprint extends beyond a local region. We present \CASCADE, a budgeted replanning mechanism that makes communication scope explicit and auditable rather than fixed or implicit. Each agent maintains an explicit knowledge base, solves role-conditioned local decision problems to revise commitments, and coordinates through lightweight contract primitives whose footprint expands only when local validation indicates that the current scope is insufficient. This design separates a unified agent substrate (Knowledge Base / Decision Manager / Communication Manager) from a scoped interaction layer that controls who is contacted, how far coordination propagates, and when escalation is triggered under explicit budgets. We evaluate \CASCADE on disrupted manufacturing and supply-chain settings using unified diagnostics intended to test a mechanism-design claim -- whether explicit scope control yields useful quality-latency-communication trade-offs and improved robustness under uncertainty -- rather than to provide a complete algorithmic ranking.

  • 1 authors
·
Mar 31

ThinkRouter: Efficient Reasoning via Routing Thinking between Latent and Discrete Spaces

Recent work explores latent reasoning to improve reasoning efficiency by replacing explicit reasoning trajectories with continuous representations in a latent space, yet its effectiveness varies across settings. Analysis of model confidence dynamics under latent reasoning reveals that thinking trajectories ending in incorrect answers contain fewer low-confidence steps than those ending in correct answers. Meanwhile, we suggest that soft embeddings aggregated by multiple low-confidence thinking alternatives may introduce and propagate noise, leading to high confidence in unreliable reasoning trajectories. Motivated by these observations, ThinkRouter, an inference-time confidence-aware routing mechanism is proposed to avoid high confidence and noise for efficient reasoning. ThinkRouter routes thinking to the discrete token space when model confidence is low, and to the latent space otherwise. Extensive experiments on STEM reasoning and coding benchmarks across diverse large reasoning models demonstrate that ThinkRouter outperforms explicit CoT, random routing, and latent reasoning baselines in terms of accuracy, achieving an average improvement of 19.70 points in Pass@1, while reducing generation length by up to 15.55%. Further comprehensive analysis reveals that ThinkRouter can calibrate errors arising from explicit CoT and latent reasoning, and accelerates end-of-thinking token generation by globally lowering model confidence.

  • 6 authors
·
Feb 12 2

VersatileFFN: Achieving Parameter Efficiency in LLMs via Adaptive Wide-and-Deep Reuse

The rapid scaling of Large Language Models (LLMs) has achieved remarkable performance, but it also leads to prohibitive memory costs. Existing parameter-efficient approaches such as pruning and quantization mainly compress pretrained models without enhancing architectural capacity, thereby hitting the representational ceiling of the base model. In this work, we propose VersatileFFN, a novel feed-forward network (FFN) that enables flexible reuse of parameters in both width and depth dimensions within a fixed parameter budget. Inspired by the dual-process theory of cognition, VersatileFFN comprises two adaptive pathways: a width-versatile path that generates a mixture of sub-experts from a single shared FFN, mimicking sparse expert routing without increasing parameters, and a depth-versatile path that recursively applies the same FFN to emulate deeper processing for complex tokens. A difficulty-aware gating dynamically balances the two pathways, steering "easy" tokens through the efficient width-wise route and allocating deeper iterative refinement to "hard" tokens. Crucially, both pathways reuse the same parameters, so all additional capacity comes from computation rather than memory. Experiments across diverse benchmarks and model scales demonstrate the effectiveness of the method. The code will be available at https://github.com/huawei-noah/noah-research/tree/master/VersatileFFN.

huawei-noah HUAWEI Noah's Ark Lab
·
Dec 16, 2025 2

Misrouter: Exploiting Routing Mechanisms for Input-Only Attacks on Mixture-of-Experts LLMs

Mixture-of-Experts (MoE) architectures have emerged as a leading paradigm for scaling large language models through sparse, routing-based computation. However, this design introduces a new attack surface: the routing mechanism that determines which experts process each input. Prior work shows that manipulating routing can bypass safety alignment, but existing attacks require model modification and thus apply only to locally deployed models. By contrast, real-world LLM services are remotely hosted and accessible only through input queries. This raises a fundamental question: can MoE routing be exploited through input-only attacks to induce stronger unsafe behaviors in real-world services? Our key insight is to optimize attacks in a white-box setting on open-source surrogate MoE models and transfer the resulting adversarial inputs to public API services within the same model family. This setting presents three main challenges: routing can be influenced only indirectly through input perturbations, routing control and output generation are tightly coupled, and even a successful safety bypass may still produce low-quality responses. To address these challenges, we propose Misrouter, an input-only attack framework that jointly targets routing behavior and expert functionality. Misrouter identifies weakly aligned experts that are willing to produce target harmful content by analyzing expert activations under harmful queries paired with unsafe continuations. It then optimizes adversarial inputs to steer routing toward these experts and away from strongly aligned ones. It further biases routing toward highly capable general-purpose experts identified from benign question-answering tasks. Finally, because routing and output objectives can conflict, Misrouter uses a two-phase optimization strategy that first steers routing and then optimizes harmful outputs while preserving routing stability.

  • 7 authors
·
May 5

Understanding the Physics of Key-Value Cache Compression for LLMs through Attention Dynamics

As context windows in LLMs scale to 100K+ tokens, the key-value (KV) cache becomes the dominant memory bottleneck, with recent methods claiming 80-90% savings and minimal benchmark degradation. We argue these evaluations miss a structural issue: attention is not just storage but routing, and retaining KV pairs does not guarantee semantic accessibility. We propose a physics-inspired view of KV compression as a controlled perturbation of token-level routing, distinguishing retention, accessibility, and utilization. Using synthetic tasks probing multi-entity tracking, disambiguation, coreference, and multi-hop reasoning, we find that moderate compression degrades internal representations with little accuracy loss, revealing redundancy; all models exhibit a sharp hallucination safety cliff near 90% compression, correlated with spikes in Global Eviction Ratio (GER), suggesting a phase transition in semantic reachability; and architectures differ in routing dynamics, with LLaMA showing early consensus and late diversification, and Qwen showing funnel-like late convergence, leading to distinct resilience profiles. Beyond erasure, we identify representational rigidity, where excessive head-level consensus collapses routing flexibility despite token survival. These results suggest sparse token-route structures govern compression tolerance, reframing KV compression as a structural probe of attention geometry and linking long-context scalability to sparsity and the lottery ticket hypothesis in self-attention.

  • 3 authors
·
Mar 1

Transform-Invariant Generative Ray Path Sampling for Efficient Radio Propagation Modeling

Ray tracing has become a standard for accurate radio propagation modeling, but suffers from exponential computational complexity, as the number of candidate paths scales with the number of objects raised to the power of the interaction order. This bottleneck limits its use in large-scale or real-time applications, forcing traditional tools to rely on heuristics to reduce the number of path candidates at the cost of potentially reduced accuracy. To overcome this limitation, we propose a comprehensive machine-learning-assisted framework that replaces exhaustive path searching with intelligent sampling via Generative Flow Networks. Applying such generative models to this domain presents significant challenges, particularly sparse rewards due to the rarity of valid paths, which can lead to convergence failures and trivial solutions when evaluating high-order interactions in complex environments. To ensure robust learning and efficient exploration, our framework incorporates three key architectural components. First, we implement an experience replay buffer to capture and retain rare valid paths. Second, we adopt a uniform exploratory policy to improve generalization and prevent the model from overfitting to simple geometries. Third, we apply a physics-based action masking strategy that filters out physically impossible paths before the model even considers them. As demonstrated in our experimental validation, the proposed model achieves substantial speedups over exhaustive search -- up to 10times faster on GPU and 1000times faster on CPU -- while maintaining high coverage accuracy and successfully uncovering complex propagation paths. The complete source code, tests, and tutorial are available at https://github.com/jeertmans/sampling-paths.

AgensFlow: A Coordination-Policy Substrate for Multi-Agent Systems

Multi-agent systems built on large language models (LLMs) require many coordination choices that are difficult to fix a priori: which skill protocol to invoke, which agent role should perform a subtask, which model to bind to each role, how roles should interact, when to use retrieval or verification, and when to omit a step entirely. These choices interact with task regime and operational constraints, so static pipelines and one-off model comparisons provide only a limited view of the design space. This paper introduces AgensFlow, an open-source framework that treats multi-agent coordination as an online policy-learning problem under partial observability. The framework makes coordination decisions observable and learnable from repeated trajectories, rather than treating skill, role, model, topology, and evaluation choices as fixed pipeline design. AgensFlow is evaluated on two corpora: distributed-systems incident tasks and security-advisory tasks. The evaluation shows three main results: learned routing reaches a higher-quality operating point than a fixed pipeline baseline on coordination-heavy classes; skip:X isolates topology compression as a meaningful part of the substrate; and warm-started policy graphs can reduce exploration cost while preserving plateau quality. Overall, the results support that learned, auditable routing can improve coordination-heavy multi-agent workflows over static wiring.

  • 1 authors
·
May 25 2

Chain of Risk: Safety Failures in Large Reasoning Models and Mitigation via Adaptive Multi-Principle Steering

Large reasoning models (LRMs) increasingly expose chain-of-thought-like reasoning for transparency, verification, and deliberate problem solving. This creates a safety blind spot: harmful or policy-violating content may appear in reasoning traces even when final answers appear safe. We test whether final-answer safety is a sufficient proxy for the full reasoning-answer trajectory by scoring both stages under a unified twenty-principle safety rubric. Using prompts from seven public harmfulness and jailbreak sources, plus four out-of-distribution (OOD) sources, we evaluate 15 open-weight and API-based LRMs across 41K prompts per model. Reasoning traces consistently reveal additional safety risks beyond final answers, especially in high-severity stage-wise failures: leak cases, where unsafe reasoning precedes a safe-looking answer, and escape cases, where benign-looking reasoning precedes an unsafe final response. Principle-level analysis shows that risk concentrates in misinformation, legal compliance, discrimination, physical harm, and psychological harm. We further propose adaptive multi-principle steering, a white-box test-time mitigation that learns one unsafe-to-safe activation direction per safety principle and activates only directions whose current hidden state is closer to the unsafe than safe centroid. On three steerable open reasoning models, adaptive steering reduces unsafe counts in both reasoning traces and final answers on held-out and OOD benchmarks. DeepSeek-R1-Qwen-7B achieves a 40.8% average unsafe-count reduction while retaining 97.7% macro-averaged accuracy on BBH, GSM8K, and MMLU. These results suggest that LRM safety should be evaluated and mitigated over the full exposed reasoning-answer trajectory, not only at the final-answer stage.

  • 9 authors
·
May 6

Glider: Global and Local Instruction-Driven Expert Router

The availability of performant pre-trained models has led to a proliferation of fine-tuned expert models that are specialized to particular domains. This has enabled the creation of powerful and adaptive routing-based "Model MoErging" methods with the goal of using expert modules to create an aggregate system with improved performance or generalization. However, existing MoErging methods often prioritize generalization to unseen tasks at the expense of performance on held-in tasks, which limits its practical applicability in real-world deployment scenarios. We observe that current token-level routing mechanisms neglect the global semantic context of the input task. This token-wise independence hinders effective expert selection for held-in tasks, as routing decisions fail to incorporate the semantic properties of the task. To address this, we propose, Global and Local Instruction Driven Expert Router (GLIDER) that integrates a multi-scale routing mechanism, encompassing a semantic global router and a learned local router. The global router leverages LLM's advanced reasoning capabilities for semantic-related contexts to enhance expert selection. Given the input query and LLM, the router generates semantic task instructions that guide the retrieval of the most relevant experts across all layers. This global guidance is complemented by a local router that facilitates token-level routing decisions within each module, enabling finer control and enhanced performance on unseen tasks. Our experiments using T5-based models for T0 and FLAN tasks demonstrate that GLIDER achieves substantially improved held-in performance while maintaining strong generalization on held-out tasks. We also perform ablations experiments to dive deeper into the components of GLIDER. Our experiments highlight the importance of our multi-scale routing that leverages LLM-driven semantic reasoning for MoErging methods.

  • 7 authors
·
Oct 9, 2024

Router-R1: Teaching LLMs Multi-Round Routing and Aggregation via Reinforcement Learning

The rapid emergence of diverse large language models (LLMs) has spurred the development of LLM routers that assign user queries to the most suitable model. However, existing LLM routers typically perform a single-round, one-to-one mapping (i.e., assigning each query to a single model in isolation), which limits their capability to tackle complex tasks that demand the complementary strengths of multiple LLMs. In this paper, we present Router-R1, a reinforcement learning (RL)-based framework that formulates multi-LLM routing and aggregation as a sequential decision process. Router-R1 instantiates the router itself as a capable LLM, leveraging its reasoning ability to interleave "think" actions (internal deliberation) with "route" actions (dynamic model invocation), and integrates each response into its evolving context. To guide learning, we employ a lightweight rule-based reward comprising format rewards, final outcome rewards, and a novel cost reward for performance and cost trade-off optimization, opening a pathway toward optimizing performance-cost tradeoffs via RL. Router-R1 also conditions only on simple model descriptors such as pricing, latency, and example performance, enabling strong generalization to unseen model selection. Experiments on seven general and multi-hop QA benchmarks show that Router-R1 outperforms over several strong baselines, achieving superior performance while maintaining robust generalization and cost management.Code is available at https://github.com/ulab-uiuc/Router-R1.

  • 3 authors
·
Jun 10, 2025 2

Dynamic Model Routing and Cascading for Efficient LLM Inference: A Survey

The rapid growth of large language models (LLMs) with diverse capabilities, costs, and domains has created a critical need for intelligent model selection at inference time. While smaller models suffice for routine queries, complex tasks demand more capable models. However, static model deployment does not account for the complexity and domain of incoming queries, leading to suboptimal performance and increased costs. Dynamic routing systems that adaptively select models based on query characteristics have emerged as a solution to this challenge. We provide a systematic analysis of state-of-the-art multi-LLM routing and cascading approaches. In contrast to mixture-of-experts architectures, which route within a single model, we study routing across multiple independently trained LLMs. We cover diverse routing paradigms, including query difficulty, human preferences, clustering, uncertainty quantification, reinforcement learning, multimodality, and cascading. For each paradigm, we analyze representative methods and examine key trade-offs. Beyond taxonomy, we introduce a conceptual framework that characterizes routing systems along three dimensions: when decisions are made, what information is used, and how they are computed. This perspective highlights that practical systems are often compositional, integrating multiple paradigms under operational constraints. Our analysis demonstrates that effective multi-LLM routing requires balancing competing objectives. Choosing the optimal routing strategy depends on deployment and computational constraints. Well-designed routing systems can outperform even the most powerful individual models by strategically leveraging specialized capabilities across models while maximizing efficiency gains. Meanwhile, open challenges remain in developing routing mechanisms that generalize across diverse architectures, modalities, and applications.

  • 2 authors
·
Apr 20 2

RouteHijack: Routing-Aware Attack on Mixture-of-Experts LLMs

Safety alignment is critical for the responsible deployment of large language models (LLMs). As Mixture-of-Experts (MoE) architectures are increasingly adopted to scale model capacity, understanding their safety robustness becomes essential. Existing adversarial attacks, however, have notable limitations. Prompt-based jailbreaks rely on heuristic search and transfer poorly, model intervention methods require privileged access to internal representations, and optimization-based input attacks remain output-centric and are fundamentally limited to MoE models due to the non-differentiable routing mechanism. In this paper, we present RouteHijack, a routing-aware jailbreak for MoE LLMs. Our key insight is that safety behavior is concentrated in a small subset of experts, creating an opportunity to steer model behavior by influencing routing decisions through input optimization. Building on this observation, RouteHijack first performs response-driven expert localization to identify safety-critical and harmful experts by contrasting activations under safe refusals and harmful completions. It then constructs adversarial suffixes with a routing-aware objective that suppresses safety experts, promotes harmful experts, and prevents early-stage refusal during generation. At inference time, the optimized suffix is appended to a malicious prompt, requiring only input access. Across seven MoE LLMs, RouteHijack achieves a 69.3\% average attack success rate (ASR), outperforming prior optimization-based attack by 3.2times. RouteHijack also transfers zero-shot across five sibling MoE variants, raising average ASR from 27.7\% to 61.2\%, and further generalizes to three MoE-based VLMs, increasing average ASR from 2.47\% to 38.7\%. These findings expose a fundamental vulnerability in sparse expert architectures and highlight the need for defenses beyond output-level alignment.

  • 4 authors
·
Apr 30

MAXS: Meta-Adaptive Exploration with LLM Agents

Large Language Model (LLM) Agents exhibit inherent reasoning abilities through the collaboration of multiple tools. However, during agent inference, existing methods often suffer from (i) locally myopic generation, due to the absence of lookahead, and (ii) trajectory instability, where minor early errors can escalate into divergent reasoning paths. These issues make it difficult to balance global effectiveness and computational efficiency. To address these two issues, we propose meta-adaptive exploration with LLM agents https://github.com/exoskeletonzj/MAXS, a meta-adaptive reasoning framework based on LLM Agents that flexibly integrates tool execution and reasoning planning. MAXS employs a lookahead strategy to extend reasoning paths a few steps ahead, estimating the advantage value of tool usage, and combines step consistency variance and inter-step trend slopes to jointly select stable, consistent, and high-value reasoning steps. Additionally, we introduce a trajectory convergence mechanism that controls computational cost by halting further rollouts once path consistency is achieved, enabling a balance between resource efficiency and global effectiveness in multi-tool reasoning. We conduct extensive empirical studies across three base models (MiMo-VL-7B, Qwen2.5-VL-7B, Qwen2.5-VL-32B) and five datasets, demonstrating that MAXS consistently outperforms existing methods in both performance and inference efficiency. Further analysis confirms the effectiveness of our lookahead strategy and tool usage.

ResMAS: Resilience Optimization in LLM-based Multi-agent Systems

Large Language Model-based Multi-Agent Systems (LLM-based MAS), where multiple LLM agents collaborate to solve complex tasks, have shown impressive performance in many areas. However, MAS are typically distributed across different devices or environments, making them vulnerable to perturbations such as agent failures. While existing works have studied the adversarial attacks and corresponding defense strategies, they mainly focus on reactively detecting and mitigating attacks after they occur rather than proactively designing inherently resilient systems. In this work, we study the resilience of LLM-based MAS under perturbations and find that both the communication topology and prompt design significantly influence system resilience. Motivated by these findings, we propose ResMAS: a two-stage framework for enhancing MAS resilience. First, we train a reward model to predict the MAS's resilience, based on which we train a topology generator to automatically design resilient topology for specific tasks through reinforcement learning. Second, we introduce a topology-aware prompt optimization method that refines each agent's prompt based on its connections and interactions with other agents. Extensive experiments across a range of tasks show that our approach substantially improves MAS resilience under various constraints. Moreover, our framework demonstrates strong generalization ability to new tasks and models, highlighting its potential for building resilient MASs.

  • 8 authors
·
Jan 7

SSL: Sweet Spot Learning for Differentiated Guidance in Agentic Optimization

Reinforcement learning with verifiable rewards has emerged as a powerful paradigm for training intelligent agents. However, existing methods typically employ binary rewards that fail to capture quality differences among trajectories achieving identical outcomes, thereby overlooking potential diversity within the solution space. Inspired by the ``sweet spot'' concept in tennis-the racket's core region that produces optimal hitting effects, we introduce Sweet Spot Learning (SSL), a novel framework that provides differentiated guidance for agent optimization. SSL follows a simple yet effective principle: progressively amplified, tiered rewards guide policies toward the sweet-spot region of the solution space. This principle naturally adapts across diverse tasks: visual perception tasks leverage distance-tiered modeling to reward proximity, while complex reasoning tasks reward incremental progress toward promising solutions. We theoretically demonstrate that SSL preserves optimal solution ordering and enhances the gradient signal-to-noise ratio, thereby fostering more directed optimization. Extensive experiments across GUI perception, short/long-term planning, and complex reasoning tasks show consistent improvements over strong baselines on 12 benchmarks, achieving up to 2.5X sample efficiency gains and effective cross-task transferability. Our work establishes SSL as a general principle for training capable and robust agents.

  • 12 authors
·
Jan 29 2

Agentic Routing: The Harness-Native Data Flywheel

Large language model agents are increasingly executed not by a single model call, but by an execution harness that manages observation, context, control, action, state, and verification. At the same time, frontier and open models are becoming structurally specialized: a model that is strong at code editing, long-context recovery, tool use, mathematical reasoning, or low-latency response may not dominate on the other axes. This makes model selection inside an agent a core systems problem rather than a per-query serving trick. Existing routing methods mostly optimize single-turn cost-quality trade-offs and therefore miss the execution state, intermediate failures, and feedback loops that make agents different from chat completion. We propose Harness-Native agentic routing, a step-level routing paradigm that selects either a single best-fit model for cost-effective execution or multiple complementary models for ensemble-style accuracy improvement, conditioned on the full harness state. The key insight is that every routing decision naturally produces a structured data record -- consisting of the query, harness state, model choice or model set, execution trace, outcome, and cost -- whose labels are supplied by the environment rather than by the router itself. These records form a harness-native data flywheel: execution traces train better routers and harness-native models, which improve cost-quality trade-offs and generate more traces under the same budget. We instantiate this idea in OpenSquilla with a four-layer routing stack, an open LightGBM cold-start ranker, and a staged router-model path that turns logged arena records into progressively stronger routing policies. The report studies singleton and multi-model routing on agentic benchmarks including DRACO and PinchBench, and argues that agentic routing is not merely cost control, but a data engine for agent-native training.

  • 15 authors
·
Jul 12

GRIP: Algorithm-Agnostic Machine Unlearning for Mixture-of-Experts via Geometric Router Constraints

Machine unlearning (MU) for large language models has become critical for AI safety, yet existing methods fail to generalize to Mixture-of-Experts (MoE) architectures. We identify that traditional unlearning methods exploit MoE's architectural vulnerability: they manipulate routers to redirect queries away from knowledgeable experts rather than erasing knowledge, causing a loss of model utility and superficial forgetting. We propose Geometric Routing Invariance Preservation (GRIP), an algorithm-agnostic framework for unlearning for MoE. Our core contribution is a geometric constraint, implemented by projecting router gradient updates into an expert-specific null-space. Crucially, this decouples routing stability from parameter rigidity: while discrete expert selections remain stable for retained knowledge, the continuous router parameters remain plastic within the null space, allowing the model to undergo necessary internal reconfiguration to satisfy unlearning objectives. This forces the unlearning optimization to erase knowledge directly from expert parameters rather than exploiting the superficial router manipulation shortcut. GRIP functions as an adapter, constraining router parameter updates without modifying the underlying unlearning algorithm. Extensive experiments on large-scale MoE models demonstrate that our adapter eliminates expert selection shift (achieving over 95% routing stability) across all tested unlearning methods while preserving their utility. By preventing existing algorithms from exploiting MoE model's router vulnerability, GRIP adapts existing unlearning research from dense architectures to MoEs.

  • 4 authors
·
Feb 14

OrgForge: A Multi-Agent Simulation Framework for Verifiable Synthetic Corporate Corpora

Evaluating retrieval-augmented generation (RAG) pipelines requires corpora where ground truth is knowable, temporally structured, and cross-artifact properties that real-world datasets rarely provide cleanly. Existing resources such as the Enron corpus carry legal ambiguity, demographic skew, and no structured ground truth. Purely LLM-generated synthetic data solves the legal problem but introduces a subtler one: the generating model cannot be prevented from hallucinating facts that contradict themselves across documents.We present OrgForge, an open-source multi-agent simulation framework that enforces a strict physics-cognition boundary: a deterministic Python engine maintains a SimEvent ground truth bus; large language models generate only surface prose, constrained by validated proposals. An actor-local clock enforces causal timestamp correctness across all artifact types, eliminating the class of timeline inconsistencies that arise when timestamps are sampled independently per document. We formalize three graph-dynamic subsystems stress propagation via betweenness centrality, temporal edge-weight decay, and Dijkstra escalation routing that govern organizational behavior independently of any LLM. Running a configurable N-day simulation, OrgForge produces interleaved Slack threads, JIRA tickets, Confluence pages, Git pull requests, and emails, all traceable to a shared, immutable event log. We additionally describe a causal chain tracking subsystem that accumulates cross-artifact evidence graphs per incident, a hybrid reciprocal-rank-fusion recurrence detector for identifying repeated failure classes, and an inbound/outbound email engine that routes vendor alerts, customer complaints, and HR correspondence through gated causal chains with probabilistic drop simulation. OrgForge is available under the MIT license.

  • 1 authors
·
Mar 16

Online Control Barrier Functions for Decentralized Multi-Agent Navigation

Control barrier functions (CBFs) enable guaranteed safe multi-agent navigation in the continuous domain. The resulting navigation performance, however, is highly sensitive to the underlying hyperparameters. Traditional approaches consider fixed CBFs (where parameters are tuned apriori), and hence, typically do not perform well in cluttered and highly dynamic environments: conservative parameter values can lead to inefficient agent trajectories, or even failure to reach goal positions, whereas aggressive parameter values can lead to infeasible controls. To overcome these issues, in this paper, we propose online CBFs, whereby hyperparameters are tuned in real-time, as a function of what agents perceive in their immediate neighborhood. Since the explicit relationship between CBFs and navigation performance is hard to model, we leverage reinforcement learning to learn CBF-tuning policies in a model-free manner. Because we parameterize the policies with graph neural networks (GNNs), we are able to synthesize decentralized agent controllers that adjust parameter values locally, varying the degree of conservative and aggressive behaviors across agents. Simulations as well as real-world experiments show that (i) online CBFs are capable of solving navigation scenarios that are infeasible for fixed CBFs, and (ii), that they improve navigation performance by adapting to other agents and changes in the environment.

  • 3 authors
·
Mar 7, 2023

PlanBench-XL: Evaluating Long-Horizon Planning of LLM Tool-Use Agents in Large-Scale Tool Ecosystems

LLM agents increasingly operate in large tool ecosystems, where real-world tasks require discovering relevant tools, inferring implicit sub-goals, and adapting to dynamic environments over long horizons. However, existing benchmarks rarely evaluate planning under retrieval-limited tool visibility. To address this gap, we introduce PlanBench-XL, an interactive benchmark of 327 retail tasks over 1,665 tools that tests whether agents can iteratively retrieve usable tools, invoke them to uncover intermediate evidence for subsequent calls toward the final goal. PlanBench-XL further features an optional blocking mechanism that simulates real-world unpredictability through missing, failing, or distracting tool functions, forcing agents to detect disrupted paths and adapt at runtime. Experiments on ten leading LLMs show that massive-tool planning remains challenging: while GPT-5.4 achieves 51.90% accuracy in block-free settings, it collapses to 11.36% under the most severe blocking condition. Further analysis shows that agents are especially vulnerable when failures lack explicit error signals or when recovery requires longer alternative tool-use paths. These results establish PlanBench-XL as a testbed for diagnosing agentic planning failures and highlight the need for robust adaptive planning in long-horizon tasks with large, imperfect tool environments.

UniPath: Adaptive Coordination of Understanding and Generation for Unified Multimodal Reasoning

Unified multimodal models (UMMs) aim to integrate understanding and generation within a single architecture. However, it remains underexplored how to effectively coordinate these two capabilities for more effective and efficient reasoning. Existing coordination approaches either perform coupling during training, without explicit inference-time coordination, or impose a fixed coordination pattern for all inputs. In this work, we show that multimodal tasks exhibit substantial coordination-path diversity: different inputs favor different coordination paths. This suggests that exploiting such diversity is key to improving performance. We propose UniPath, a framework for adaptively modeling and exploiting coordination-path diversity. Instead of enforcing a single coordination pattern, we represent task solving as the selection and execution of a path, ranging from direct answering to textual inference, visual-thought construction, and hypothesis-based exploration. We construct role-aligned trajectories to train a path-conditioned executor and introduce a lightweight planner mechanism to enable input-dependent path selection. Experiments show that leveraging coordination-path diversity improves performance over fixed coordination strategies while providing interpretable intermediate behaviors. The code is available at:https://github.com/AIFrontierLab/TorchUMM/tree/main/src/umm/post_training/unipath.

GenMRP: A Generative Multi-Route Planning Framework for Efficient and Personalized Real-Time Industrial Navigation

Existing industrial-scale navigation applications contend with massive road networks, typically employing two main categories of approaches for route planning. The first relies on precomputed road costs for optimal routing and heuristic algorithms for generating alternatives, while the second, generative methods, has recently gained significant attention. However, the former struggles with personalization and route diversity, while the latter fails to meet the efficiency requirements of large-scale real-time scenarios. To address these limitations, we propose GenMRP, a generative framework for multi-route planning. To ensure generation efficiency, GenMRP first introduces a skeleton-to-capillary approach that dynamically constructs a relevant sub-network significantly smaller than the full road network. Within this sub-network, routes are generated iteratively. The first iteration identifies the optimal route, while the subsequent ones generate alternatives that balance quality and diversity using the newly proposed correctional boosting approach. Each iteration incorporates road features, user historical sequences, and previously generated routes into a Link Cost Model to update road costs, followed by route generation using the Dijkstra algorithm. Extensive experiments show that GenMRP achieves state-of-the-art performance with high efficiency in both offline and online environments. To facilitate further research, we have publicly released the training and evaluation dataset. GenMRP has been fully deployed in a real-world navigation app, demonstrating its effectiveness and benefits.

  • 9 authors
·
Feb 3

A Sublinear Algorithm for Approximate Shortest Paths in Large Networks

Computing distances and finding shortest paths in massive real-world networks is a fundamental algorithmic task in network analysis. There are two main approaches to solving this task. On one hand are traversal-based algorithms like bidirectional breadth-first search (BiBFS) with no preprocessing step and slow individual distance inquiries. On the other hand are indexing-based approaches, which maintain a large index. This allows for answering individual inquiries very fast; however, index creation is prohibitively expensive. We seek to bridge these two extremes: quickly answer distance inquiries without the need for costly preprocessing. In this work, we propose a new algorithm and data structure, WormHole, for approximate shortest path computations. WormHole leverages structural properties of social networks to build a sublinearly sized index, drawing upon the explicit core-periphery decomposition of Ben-Eliezer et al. Empirically, the preprocessing time of WormHole improves upon index-based solutions by orders of magnitude, and individual inquiries are consistently much faster than in BiBFS. The acceleration comes at the cost of a minor accuracy trade-off. Nonetheless, our empirical evidence demonstrates that WormHole accurately answers essentially all inquiries within a maximum additive error of 2. We complement these empirical results with provable theoretical guarantees, showing that WormHole requires n^{o(1)} node queries per distance inquiry in random power-law networks. In contrast, any approach without a preprocessing step requires n^{Ω(1)} queries for the same task. WormHole does not require reading the whole graph. Unlike the vast majority of index-based algorithms, it returns paths, not just distances. For faster inquiry times, it can be combined effectively with other index-based solutions, by running them only on the sublinear core.

  • 5 authors
·
Jun 11, 2024

Adaptive Vision-Language Model Routing for Computer Use Agents

Computer Use Agents (CUAs) translate natural-language instructions into Graphical User Interface (GUI) actions such as clicks, keystrokes, and scrolls by relying on a Vision-Language Model (VLM) to interpret screenshots and predict grounded tool calls. However, grounding accuracy varies dramatically across VLMs, while current CUA systems typically route every action to a single fixed model regardless of difficulty. We propose Adaptive VLM Routing (AVR), a framework that inserts a lightweight semantic routing layer between the CUA orchestrator and a pool of VLMs. For each tool call, AVR estimates action difficulty from multimodal embeddings, probes a small VLM to measure confidence, and routes the action to the cheapest model whose predicted accuracy satisfies a target reliability threshold. For warm agents with memory of prior UI interactions, retrieved context further narrows the capability gap between small and large models, allowing many actions to be handled without escalation. We formalize routing as a cost--accuracy trade-off, derive a threshold-based policy for model selection, and evaluate AVR using ScreenSpot-Pro grounding data together with the OpenClaw agent routing benchmark. Across these settings, AVR projects inference cost reductions of up to 78\% while staying within 2 percentage points of an all-large-model baseline. When combined with the Visual Confused Deputy guardrail, AVR also escalates high-risk actions directly to the strongest available model, unifying efficiency and safety within a single routing framework. Materials are also provided Model, benchmark, and code: https://github.com/vllm-project/semantic-router.

  • 6 authors
·
Mar 12

Stochastic CHAOS: Why Deterministic Inference Kills, and Distributional Variability Is the Heartbeat of Artifical Cognition

Deterministic inference is a comforting ideal in classical software: the same program on the same input should always produce the same output. As large language models move into real-world deployment, this ideal has been imported wholesale into inference stacks. Recent work from the Thinking Machines Lab has presented a detailed analysis of nondeterminism in LLM inference, showing how batch-invariant kernels and deterministic attention can enforce bitwise-identical outputs, positioning deterministic inference as a prerequisite for reproducibility and enterprise reliability. In this paper, we take the opposite stance. We argue that, for LLMs, deterministic inference kills. It kills the ability to model uncertainty, suppresses emergent abilities, collapses reasoning into a single brittle path, and weakens safety alignment by hiding tail risks. LLMs implement conditional distributions over outputs, not fixed functions. Collapsing these distributions to a single canonical completion may appear reassuring, but it systematically conceals properties central to artificial cognition. We instead advocate Stochastic CHAOS, treating distributional variability as a signal to be measured and controlled. Empirically, we show that deterministic inference is systematically misleading. Single-sample deterministic evaluation underestimates both capability and fragility, masking failure probability under paraphrases and noise. Phase-like transitions associated with emergent abilities disappear under greedy decoding. Multi-path reasoning degrades when forced onto deterministic backbones, reducing accuracy and diagnostic insight. Finally, deterministic evaluation underestimates safety risk by hiding rare but dangerous behaviors that appear only under multi-sample evaluation.

  • 10 authors
·
Jan 12 2

Saffron-1: Towards an Inference Scaling Paradigm for LLM Safety Assurance

Existing safety assurance research has primarily focused on training-phase alignment to instill safe behaviors into LLMs. However, recent studies have exposed these methods' susceptibility to diverse jailbreak attacks. Concurrently, inference scaling has significantly advanced LLM reasoning capabilities but remains unexplored in the context of safety assurance. Addressing this gap, our work pioneers inference scaling for robust and effective LLM safety against emerging threats. We reveal that conventional inference scaling techniques, despite their success in reasoning tasks, perform poorly in safety contexts, even falling short of basic approaches like Best-of-N Sampling. We attribute this inefficiency to a newly identified challenge, the exploration--efficiency dilemma, arising from the high computational overhead associated with frequent process reward model (PRM) evaluations. To overcome this dilemma, we propose SAFFRON, a novel inference scaling paradigm tailored explicitly for safety assurance. Central to our approach is the introduction of a multifurcation reward model (MRM) that significantly reduces the required number of reward model evaluations. To operationalize this paradigm, we further propose: (i) a partial supervision training objective for MRM, (ii) a conservative exploration constraint to prevent out-of-distribution explorations, and (iii) a Trie-based key--value caching strategy that facilitates cache sharing across sequences during tree search. Extensive experiments validate the effectiveness of our method. Additionally, we publicly release our trained multifurcation reward model (Saffron-1) and the accompanying token-level safety reward dataset (Safety4M) to accelerate future research in LLM safety. Our code, model, and data are publicly available at https://github.com/q-rz/saffron , and our project homepage is at https://q-rz.github.io/p/saffron .

  • 5 authors
·
Jun 6, 2025 2

ToolTok: Tool Tokenization for Efficient and Generalizable GUI Agents

Existing GUI agent models relying on coordinate-based one-step visual grounding struggle with generalizing to varying input resolutions and aspect ratios. Alternatives introduce coordinate-free strategies yet suffer from learning under severe data scarcity. To address the limitations, we propose ToolTok, a novel paradigm of multi-step pathfinding for GUI agents, where operations are modeled as a sequence of progressive tool usage. Specifically, we devise tools aligned with human interaction habits and represent each tool using learnable token embeddings. To enable efficient embedding learning under limited supervision, ToolTok introduces a semantic anchoring mechanism that grounds each tool with semantically related concepts as natural inductive bias. To further enable a pre-trained large language model to progressively acquire tool semantics, we construct an easy-to-hard curriculum consisting of three tasks: token definition question-answering, pure text-guided tool selection, and simplified visual pathfinding. Extensive experiments on multiple benchmarks show that ToolTok achieves superior performance among models of comparable scale (4B) and remains competitive with a substantially larger model (235B). Notably, these results are obtained using less than 1% of the training data required by other post-training approaches. In addition, ToolTok demonstrates strong generalization across unseen scenarios. Our training & inference code is open-source at https://github.com/ZephinueCode/ToolTok.

  • 6 authors
·
Jan 29

Efficient and Trainable Language Model Test-Time Scaling via Local Branch Routing

Test-time scaling improves language-model reasoning, but existing approaches often face a difficult trade-off: long chain-of-thought sampling remains single-threaded, while sentence- or solution-level search can be computationally expensive and hard to train end-to-end. We introduce Local Branch Routing (LBR), a token-level test-time scaling framework that expands a small local lookahead tree, forwards all sampled branches through the language model, and uses a lightweight router to select the depth-1 subtree to commit. By routing over the hidden states of candidate local futures, LBR allows each token decision to use evidence beyond the root next-token distribution while avoiding full solution-level search. The resulting prune-shift-grow decoding process preserves discrete branch identities and defines a tractable tree-trajectory likelihood: newly grown nodes are counted when first sampled, and router decisions are assigned explicit probabilities. This enables end-to-end reinforcement learning with verifiable rewards, jointly optimizing the base model and router under the same likelihood-ratio principle as discrete-token RLVR. On synthetic hierarchical-planning tasks, LBR shows that post-candidate hidden states provide useful routing evidence. On mathematical reasoning benchmarks, LBR improves both Pass@1 and Pass@32 over discrete chain-of-thought, vanilla discrete-token RLVR, and RL-compatible soft-token branching baselines. These results suggest that lightweight local branching offers an efficient, trainable, and discrete form of language-model test-time scaling.

  • 15 authors
·
Jun 28

Adversarial Feeds Steer LLM Agent Decisions Against Their Defaults

LLM agents increasingly act after consuming ranked external information streams such as social feeds, search results, retrieval contexts, and email queues, yet safety evaluations almost always test the model or the user prompt in isolation, never the upstream ranker that decides what the agent reads just before it acts. We introduce a controlled protocol that holds the model, persona, topic, and final decision prompt fixed and varies only the composition and ordering of the posts an agent encounters during a preceding ten-turn "scrolling" phase, isolating the causal effect of feed curation on a downstream decision. Across 2,785 decision rollouts on four modern open instruct LLMs from three independent labs, we identify three response regimes: adversarial capitulation, default saturation, and a default-direction asymmetry in which a one-sided feed tips a decision the model was genuinely uncertain about (in the clearest cases from 5% to 100%; Fisher p as low as 3 x 10^-10) but cannot dislodge one it already favors or holds firmly. The effect follows a dose-response curve, survives a generator swap that rules out a writing-style artifact, generalizes across several decision domains including security-relevant choices such as removing a deployment approval gate or relaxing access controls, and is partly mitigated by two simple feed-level defenses; a frontier model retains its default. We characterize the recommender as a practical, default-bounded control surface for LLM agents, and argue that agent evaluations must audit the feed layer rather than the final prompt alone.

  • 1 authors
·
May 29

Symphony-Coord: Emergent Coordination in Decentralized Agent Systems

Multi-agent large language model systems can tackle complex multi-step tasks by decomposing work and coordinating specialized behaviors. However, current coordination mechanisms typically rely on statically assigned roles and centralized controllers. As agent pools and task distributions evolve, these design choices lead to inefficient routing, poor adaptability, and fragile fault recovery capabilities. We introduce Symphony-Coord, a decentralized multi-agent framework that transforms agent selection into an online multi-armed bandit problem, enabling roles to emerge organically through interaction. The framework employs a two-stage dynamic beacon protocol: (i) a lightweight candidate screening mechanism to limit communication and computational overhead; (ii) an adaptive LinUCB selector that routes subtasks based on context features derived from task requirements and agent states, continuously optimized through delayed end-to-end feedback. Under standard linear realizability assumptions, we provide sublinear regret bounds, indicating the system converges toward near-optimal allocation schemes. Validation through simulation experiments and real-world large language model benchmarks demonstrates that Symphony-Coord not only enhances task routing efficiency but also exhibits robust self-healing capabilities in scenarios involving distribution shifts and agent failures, achieving a scalable coordination mechanism without predefined roles.

  • 7 authors
·
Jan 31

From Cognitive Architectures to Language Agents: A Mechanism-Level Review of Lineage, Convergence, and Migration Gaps

Memory, planning, reflection, and tool use are often compared as feature labels, obscuring the control semantics that determine how an agent actually runs. This review connects ten historical cognitive architectures, eight language-agent runtime families, and forty-two mechanism-focused modern systems. We reconstruct each mechanism through state, control, transition, persistence, failure, learning, and resource governance, then code evidence relation (E1-E4) separately from migration depth (D0-D4). The resulting landscape is uneven. Modern agents have operationalized substantial parts of adaptive memory, failure recovery, dynamic team selection, workflow search, skill induction, resource scheduling, and uncertainty-conditioned action, although often through independent convergence rather than documented inheritance. The strongest remaining opportunities lie in couplings among mechanisms. Closest-baseline screening closes one proposed gap: GraSP already combines calibrated multi-skill selection, typed compilation, verification, bounded repair, and replanning or ReAct fallback. Five residual bundles remain: activation with latency and action utility; typed impasse with isolated substates and resolution compilation; bounded content competition with broadcast and admission learning; persistent intention with reconsideration and live method authority; and uncertainty with resource allocation, interruption, and stopping. We contribute a distinctive-mechanism catalog, an auditable evidence-depth framework, and a falsifiable agenda for testing these bundles as composable runtime invariants.

  • 2 authors
·
Jul 26

AgentSwing: Adaptive Parallel Context Management Routing for Long-Horizon Web Agents

As large language models (LLMs) evolve into autonomous agents for long-horizon information-seeking, managing finite context capacity has become a critical bottleneck. Existing context management methods typically commit to a single fixed strategy throughout the entire trajectory. Such static designs may work well in some states, but they cannot adapt as the usefulness and reliability of the accumulated context evolve during long-horizon search. To formalize this challenge, we introduce a probabilistic framework that characterizes long-horizon success through two complementary dimensions: search efficiency and terminal precision. Building on this perspective, we propose AgentSwing, a state-aware adaptive parallel context management routing framework. At each trigger point, AgentSwing expands multiple context-managed branches in parallel and uses lookahead routing to select the most promising continuation. Experiments across diverse benchmarks and agent backbones show that AgentSwing consistently outperforms strong static context management methods, often matching or exceeding their performance with up to 3times fewer interaction turns while also improving the ultimate performance ceiling of long-horizon web agents. Beyond the empirical gains, the proposed probabilistic framework provides a principled lens for analyzing and designing future context management strategies for long-horizon agents.

Alibaba-NLP Alibaba-NLP
·
Mar 28 2

Scaling Continual Learning to 300+ Tasks with Bi-Level Routing Mixture-of-Experts

Continual learning, especially class-incremental learning (CIL), on the basis of a pre-trained model (PTM) has garnered substantial research interest in recent years. However, how to effectively learn both discriminative and comprehensive feature representations while maintaining stability and plasticity over very long task sequences remains an open problem. We propose CaRE, a scalable {C}ontinual Le{a}rner with efficient Bi-Level {R}outing Mixture-of-{E}xperts (BR-MoE). The core idea of BR-MoE is a bi-level routing mechanism: a router selection stage that dynamically activates relevant task-specific routers, followed by an expert routing phase that dynamically activates and aggregates experts, aiming to inject discriminative and comprehensive representations into every intermediate network layer. On the other hand, we introduce a challenging dataset, OmniBenchmark-1K, for CIL performance evaluation on very long task sequences with hundreds of tasks. Extensive experiments show that CaRE demonstrates leading performance across a variety of datasets and task settings, including commonly used CIL datasets with classical CIL settings (e.g., 5-20 tasks). To the best of our knowledge, CaRE is the first continual learner that scales to very long task sequences (ranging from 100 to over 300 non-overlapping tasks), while outperforming all baselines by a large margin on such task sequences. We hope that this work will inspire further research into continual learning over extremely long task sequences. Code and dataset are publicly released at https://github.com/LMMMEng/CaRE.

Improving Routing in Sparse Mixture of Experts with Graph of Tokens

Sparse Mixture of Experts (SMoE) has emerged as a key to achieving unprecedented scalability in deep learning. By activating only a small subset of parameters per sample, SMoE achieves an exponential increase in parameter counts while maintaining a constant computational overhead. However, SMoE models are susceptible to routing fluctuations--changes in the routing of a given input to its target expert--at the late stage of model training, leading to model non-robustness. In this work, we unveil the limitation of SMoE through the perspective of the probabilistic graphical model (PGM). Through this PGM framework, we highlight the independence in the expert-selection of tokens, which exposes the model to routing fluctuation and non-robustness. Alleviating this independence, we propose the novel Similarity-Aware (S)MoE, which considers interactions between tokens during expert selection. We then derive a new PGM underlying an (S)MoE-Attention block, going beyond just a single (S)MoE layer. Leveraging the token similarities captured by the attention matrix, we propose the innovative Attention-Aware (S)MoE, which employs the attention matrix to guide the routing of tokens to appropriate experts in (S)MoE. We theoretically prove that Similarity/Attention-Aware routing help reduce the entropy of expert selection, resulting in more stable token routing mechanisms. We empirically validate our models on various tasks and domains, showing significant improvements in reducing routing fluctuations, enhancing accuracy, and increasing model robustness over the baseline MoE-Transformer with token routing via softmax gating.

  • 4 authors
·
May 1, 2025

GlimpRouter: Efficient Collaborative Inference by Glimpsing One Token of Thoughts

Large Reasoning Models (LRMs) achieve remarkable performance by explicitly generating multi-step chains of thought, but this capability incurs substantial inference latency and computational cost. Collaborative inference offers a promising solution by selectively allocating work between lightweight and large models, yet a fundamental challenge remains: determining when a reasoning step requires the capacity of a large model or the efficiency of a small model. Existing routing strategies either rely on local token probabilities or post-hoc verification, introducing significant inference overhead. In this work, we propose a novel perspective on step-wise collaboration: the difficulty of a reasoning step can be inferred from its very first token. Inspired by the "Aha Moment" phenomenon in LRMs, we show that the entropy of the initial token serves as a strong predictor of step difficulty. Building on this insight, we introduce GlimpRouter, a training-free step-wise collaboration framework. GlimpRouter employs a lightweight model to generate only the first token of each reasoning step and routes the step to a larger model only when the initial token entropy exceeds a threshold. Experiments on multiple benchmarks demonstrate that our approach significantly reduces inference latency while preserving accuracy. For instance, GlimpRouter attains a substantial 10.7% improvement in accuracy while reducing inference latency by 25.9% compared to a standalone large model on AIME25. These results suggest a simple yet effective mechanism for reasoning: allocating computation based on a glimpse of thought rather than full-step evaluation.

Informed Routing in LLMs: Smarter Token-Level Computation for Faster Inference

The deployment of large language models (LLMs) in real-world applications is increasingly limited by their high inference cost. While recent advances in dynamic token-level computation allocation attempt to improve efficiency by selectively activating model components per token, existing methods rely on greedy routing--a myopic execute-or-skip mechanism that often leads to irreversible information loss and suboptimal token selection. This paper introduces informed routing, a new paradigm that proactively addresses these issues. The key insight is to assess not only a token's immediate importance but also its recoverability, i.e., how well its transformation can be approximated. To this end, we propose the Lightweight Feature Forecaster (LFF), a small predictive module that estimates a unit's output before routing decisions are made. This enables a flexible execute-or-approximate policy that preserves model fidelity while drastically reducing computation. Extensive experiments on both language modeling and reasoning tasks show that informed routing achieves state-of-the-art efficiency-performance trade-offs across multiple sparsity levels. Notably, even without final LoRA fine-tuning, our method matches or surpasses strong baselines that require full fine-tuning, all while reducing training time by over 50%. The code is available at: https://github.com/EIT-NLP/informed-routing

  • 6 authors
·
Oct 10, 2025

Spend Less, Reason Better: Budget-Aware Value Tree Search for LLM Agents

Test-time scaling has become a dominant paradigm for improving LLM agent reliability, yet current approaches treat compute as an abundant resource, allowing agents to exhaust token and tool budgets on redundant steps or dead-end trajectories. Existing budget-aware methods either require expensive fine-tuning or rely on coarse, trajectory-level heuristics that cannot intervene mid-execution. We propose the Budget-Aware Value Tree (BAVT), a training-free inference-time framework that models multi-hop reasoning as a dynamic search tree guided by step-level value estimation within a single LLM backbone. Another key innovation is a budget-conditioned node selection mechanism that uses the remaining resource ratio as a natural scaling exponent over node values, providing a principled, parameter-free transition from broad exploration to greedy exploitation as the budget depletes. To combat the well-known overconfidence of LLM self-evaluation, BAVT employs a residual value predictor that scores relative progress rather than absolute state quality, enabling reliable pruning of uninformative or redundant tool calls. We further provide a theoretical convergence guarantee, proving that BAVT reaches a terminal answer with probability at least 1-ε under an explicit finite budget bound. Extensive evaluations on four multi-hop QA benchmarks across two model families demonstrate that BAVT consistently outperforms parallel sampling baselines. Most notably, BAVT under strict low-budget constraints surpasses baseline performance at 4times the resource allocation, establishing that intelligent budget management fundamentally outperforms brute-force compute scaling.

  • 4 authors
·
Mar 13 1

Duo-LLM: A Framework for Studying Adaptive Computation in Large Language Models

Large Language Models (LLMs) typically generate outputs token by token using a fixed compute budget, leading to inefficient resource utilization. To address this shortcoming, recent advancements in mixture of expert (MoE) models, speculative decoding, and early exit strategies leverage the insight that computational demands can vary significantly based on the complexity and nature of the input. However, identifying optimal routing patterns for dynamic execution remains an open challenge, limiting the full potential of these adaptive methods. To address this need, we study adaptive computation in LLMs more systematically. We propose a novel framework that integrates smaller auxiliary modules within each Feed-Forward Network layer of the LLM. This design enables dynamic routing of tokens based on task complexity: tokens can be processed by either the small or big modules at each layer, or even bypass certain layers entirely. This allows us to introduce a novel notion of a token's difficulty, defined by its potential to benefit from additional computational resources. Importantly, by employing oracles to identify optimal patterns of adaptive computations, we gain valuable insights into the internal workings of LLMs and the routing processes in a simplified heterogeneous MoE setup. We show that trained routers operate differently from oracles and often yield suboptimal solutions. Notably, activating a large module in just one layer outperforms models that use large modules across all layers, underscoring the gap between practical implementations of routing in MoE models and theoretical optima for adaptive computation.

  • 9 authors
·
Oct 1, 2024

Learned Perceptive Forward Dynamics Model for Safe and Platform-aware Robotic Navigation

Ensuring safe navigation in complex environments requires accurate real-time traversability assessment and understanding of environmental interactions relative to the robot`s capabilities. Traditional methods, which assume simplified dynamics, often require designing and tuning cost functions to safely guide paths or actions toward the goal. This process is tedious, environment-dependent, and not generalizable. To overcome these issues, we propose a novel learned perceptive Forward Dynamics Model (FDM) that predicts the robot`s future state conditioned on the surrounding geometry and history of proprioceptive measurements, proposing a more scalable, safer, and heuristic-free solution. The FDM is trained on multiple years of simulated navigation experience, including high-risk maneuvers, and real-world interactions to incorporate the full system dynamics beyond rigid body simulation. We integrate our perceptive FDM into a zero-shot Model Predictive Path Integral (MPPI) planning framework, leveraging the learned mapping between actions, future states, and failure probability. This allows for optimizing a simplified cost function, eliminating the need for extensive cost-tuning to ensure safety. On the legged robot ANYmal, the proposed perceptive FDM improves the position estimation by on average 41% over competitive baselines, which translates into a 27% higher navigation success rate in rough simulation environments. Moreover, we demonstrate effective sim-to-real transfer and showcase the benefit of training on synthetic and real data. Code and models are made publicly available under https://github.com/leggedrobotics/fdm.

  • 4 authors
·
Apr 27, 2025

Intention Chain-of-Thought Prompting with Dynamic Routing for Code Generation

Large language models (LLMs) exhibit strong generative capabilities and have shown great potential in code generation. Existing chain-of-thought (CoT) prompting methods enhance model reasoning by eliciting intermediate steps, but suffer from two major limitations: First, their uniform application tends to induce overthinking on simple tasks. Second, they lack intention abstraction in code generation, such as explicitly modeling core algorithmic design and efficiency, leading models to focus on surface-level structures while neglecting the global problem objective. Inspired by the cognitive economy principle of engaging structured reasoning only when necessary to conserve cognitive resources, we propose RoutingGen, a novel difficulty-aware routing framework that dynamically adapts prompting strategies for code generation. For simple tasks, it adopts few-shot prompting; for more complex ones, it invokes a structured reasoning strategy, termed Intention Chain-of-Thought (ICoT), which we introduce to guide the model in capturing task intention, such as the core algorithmic logic and its time complexity. Experiments across three models and six standard code generation benchmarks show that RoutingGen achieves state-of-the-art performance in most settings, while reducing total token usage by 46.37% on average across settings. Furthermore, ICoT outperforms six existing prompting baselines on challenging benchmarks.

  • 7 authors
·
Dec 15, 2025

Safe Multi-Agent Navigation guided by Goal-Conditioned Safe Reinforcement Learning

Safe navigation is essential for autonomous systems operating in hazardous environments. Traditional planning methods excel at long-horizon tasks but rely on a predefined graph with fixed distance metrics. In contrast, safe Reinforcement Learning (RL) can learn complex behaviors without relying on manual heuristics but fails to solve long-horizon tasks, particularly in goal-conditioned and multi-agent scenarios. In this paper, we introduce a novel method that integrates the strengths of both planning and safe RL. Our method leverages goal-conditioned RL and safe RL to learn a goal-conditioned policy for navigation while concurrently estimating cumulative distance and safety levels using learned value functions via an automated self-training algorithm. By constructing a graph with states from the replay buffer, our method prunes unsafe edges and generates a waypoint-based plan that the agent follows until reaching its goal, effectively balancing faster and safer routes over extended distances. Utilizing this unified high-level graph and a shared low-level goal-conditioned safe RL policy, we extend this approach to address the multi-agent safe navigation problem. In particular, we leverage Conflict-Based Search (CBS) to create waypoint-based plans for multiple agents allowing for their safe navigation over extended horizons. This integration enhances the scalability of goal-conditioned safe RL in multi-agent scenarios, enabling efficient coordination among agents. Extensive benchmarking against state-of-the-art baselines demonstrates the effectiveness of our method in achieving distance goals safely for multiple agents in complex and hazardous environments. Our code and further details about or work is available at https://safe-visual-mapf-mers.csail.mit.edu/.

  • 3 authors
·
Feb 24, 2025

SkillRouter: Retrieve-and-Rerank Skill Selection for LLM Agents at Scale

As LLM agent ecosystems grow, the number of available skills (tools, plugins) has reached tens of thousands, making it infeasible to inject all skills into an agent's context. This creates a need for skill routing -- retrieving the most relevant skills from a large pool given a user task. The problem is compounded by pervasive functional overlap in community skill repositories, where many skills share similar names and purposes yet differ in implementation details. Despite its practical importance, skill routing remains under-explored. Current agent architectures adopt a progressive disclosure design -- exposing only skill names and descriptions to the agent while keeping the full implementation body hidden -- implicitly treating metadata as sufficient for selection. We challenge this assumption through a systematic empirical study on a benchmark of ~$80K skills and 75 expert-verified queries. Our key finding is that the skill body (full implementation text) is the decisive signal: removing it causes 29--44 percentage point degradation across all retrieval methods, and cross-encoder attention analysis reveals 91.7% of attention concentrating on the body field. Motivated by this finding, we propose SkillRouter, a two-stage retrieve-and-rerank pipeline totaling only 1.2B parameters (0.6B encoder + 0.6B reranker). SkillRouter achieves 74.0% top-1 routing accuracy and delivers the strongest average result among the compact and zero-shot baselines we evaluate, while remaining deployable on consumer hardware.

  • 7 authors
·
Mar 23

Beyond Uniform Token-Level Trust Region in LLM Reinforcement Learning

Reinforcement learning with verifiable rewards (RLVR) has become standard for improving LLM reasoning. However, existing PPO-style trust-region mechanisms remain position-agnostic by enforcing uniform thresholds across all tokens independently. This pointwise treatment conflicts with autoregressive generation in two critical ways. First, uniform thresholds ignore autoregressive asymmetry. Early-stage deviations produce compounding sequence-level drift, causing static thresholds to under-regulate early divergence and excessively constrain late-stage exploration. Second, evaluating token-level divergence in isolation overlooks cumulative prefix drift, granting the same divergence allowance regardless of how far the conditioning history has already deviated from the rollout policy. To address this limitation, we propose CPPO (Cumulative Prefix-divergence Policy Optimization), a token-level masking rule that aligns updates with a finite-horizon policy-improvement bound via two coupled mechanisms. First, a position-weighted threshold imposes stricter limits at early positions whose effects persist longer, relaxing constraints for late-stage tokens. Second, a cumulative prefix budget tracks historical deviations, dynamically restricting further token-level deviation to prevent compounding errors along the prefix. Empirically, CPPO enhances training stability and significantly improves reasoning accuracy across various model scales.

When Users Change Their Mind: Evaluating Interruptible Agents in Long-Horizon Web Navigation

As LLM agents transition from short, static problem solving to executing complex, long-horizon tasks in dynamic environments, the ability to handle user interruptions, such as adding requirement or revising goals, during mid-task execution is becoming a core requirement for realistic deployment. However, existing benchmarks largely assume uninterrupted agent behavior or study interruptions only in short, unconstrained language tasks. In this paper, we present the first systematic study of interruptible agents in long-horizon, environmentally grounded web navigation tasks, where actions induce persistent state changes. We formalize three realistic interruption types, including addition, revision, and retraction, and introduce InterruptBench, a benchmark derived from WebArena-Lite that synthesizes high-quality interruption scenarios under strict semantic constraints. Using a unified interruption simulation framework, we evaluate six strong LLM backbones across single- and multi-turn interruption settings, analyzing both their effectiveness in adapting to updated intents and their efficiency in recovering from mid-task changes. Our results show that handling user interruptions effectively and efficiently during long-horizon agentic tasks remains challenging for powerful large-scale LLMs. Code and dataset are available at https://github.com/HenryPengZou/InterruptBench.

TwinRouterBench: Fast Static and Live Dynamic Evaluation for Realistic Agentic LLM Routing

LLM routing matters most in long-horizon applications such as coding agents, deep research systems, and computer-use agents, where a single user request triggers many model calls. Routing each call to the cheapest sufficient model can cut costs without sacrificing quality, yet existing router benchmarks evaluate routers only on one-shot prompts. They never expose the router-visible prefix at an intermediate agent step, never test whether a cheaper replacement preserves downstream task success, and often rely on online LLM judges at evaluation time. We introduce TwinRouterBench, a step-level routing benchmark with two tracks. The static track provides 970 router-visible prefixes from 520 instances across SWE-bench, BFCL, mtRAG, QMSum, and PinchBench, each paired with an execution-verified target tier estimated under a released downgrade-and-cascade protocol; scoring is deterministic arithmetic over tier labels, trajectory membership, and token costs, with no online evaluator-side LLM judge. The dynamic track supplies a harness that runs routers on the full 500-case SWE-bench Verified suite; in this paper we report a 100-case held-out evaluation disjoint from the static SWE supervision split. At each LLM call the router selects a concrete model from a locked pool, and success is measured by official task resolution and realized API spend. The two tracks support fast offline iteration followed by end-to-end validation under live agent execution. Code and data are available at https://github.com/CommonstackAI/TwinRouterBench.

  • 17 authors
·
May 13
Free AI Image Generator No sign-up. Instant results. Open Now